Results Tab Properties
AdminStudio 2020 | 19.0 | Automated Application Converter
The Results tab includes the following properties and information:
Property |
Description |
Name |
List of logged results for each run of this project. The log is identified by the date and time it was started, and the packages that were part of this run are listed in a tree structure under the log title. Click the plus sign to expand the listing. |
Date and time the conversion of each package began. |
|
The number of errors generated for each package in this run is listed in this column next to each package. The cumulative sum of all errors generated for all of the packages in the run is listed in this column next to the parent Log row. |
|
The number of warnings generated for each package in this run is listed in this column next to each package. The cumulative sum of all warnings generated for all of the packages in the run is listed in this column next to the parent Log row. |
|
Results Icons |
Icons in these columns indicate the status of each of the steps of the repackaging and conversion process. See Icons Used on the Results Tab for detailed information. |