Scheduling Classic Reports
Using the Report Scheduling page, you can schedule a report to run at the same time on specified days. This way, you can schedule a report to run nightly, weekly, monthly, and so on.
Note:Only a user with the Super Administrator role or the user who originally started running the report can cancel a report while it is in progress, whether the report is run manually or by the FlexNet Manager for Engineering Applications scheduler.
To run a report at scheduled times:
|
1.
|
From the Reporting tab, under Classic Reporting, click Report Configurations. This displays the Report Configurations page. |
|
2.
|
Click the Schedule button to the right of the report configuration for which you want to schedule a run. This opens the Report Scheduling page. |
|
3.
|
In the Run Report section, click one of the radio buttons: |
|
•
|
Not Scheduled—This report is not scheduled to run. |
|
•
|
These days at (hh:mm)—Specify a time (using a 24-hour clock) and select the days of the week on which you want the report to run. |
|
•
|
These months on day (number of day in a month) at (hh:mm)—Select the day, specify a time (using a 24-hour clock), and select the months on which you want the report to run. |
After the report runs, the report output is available in the Report Inbox.
See Also
Reporting on License Usage
Running Classic Reports
Viewing Classic Report Output in the Report Inbox